Thursday, April 2, 2009

Layout of Tower Core

The Central Tower Core Plan is located below and on the Flickr Account . Izaac has provided dimensions and highlights on access to the core. This is important information for all groups.

The floor plate size will need to be designed to the areas described in the previous post at a minimum.
























IMPORTANT INFORMATION:

The ORANGE highlighted doorways needs to have easy and direct access from ALL floors. The YELLOW highlighted doorway is the medical elevator which needs to be inside the medical room on the first floor. The PURPLE doorway needs to be accessible but can be accessible from ANY room. It's only for mechanical purposes. The only room w/out an X through it is a mechanical shaft, along with area behind stairs.

Remember: TIME is CRITICAL