Thursday, April 2, 2009

Layout of Tower Core

The Central Tower Core Plan is located below and on the Flickr Account . Izaac has provided dimensions and highlights on access to the core. This is important information for all groups.

The floor plate size will need to be designed to the areas described in the previous post at a minimum.
























IMPORTANT INFORMATION:

The ORANGE highlighted doorways needs to have easy and direct access from ALL floors. The YELLOW highlighted doorway is the medical elevator which needs to be inside the medical room on the first floor. The PURPLE doorway needs to be accessible but can be accessible from ANY room. It's only for mechanical purposes. The only room w/out an X through it is a mechanical shaft, along with area behind stairs.

Remember: TIME is CRITICAL

Monday, March 23, 2009

New Spa Link












Check out this Spa in Montreal, Quebec, Canada.
See Link Below and in the Links Section.

Scandinave Les Bains Vieux

Thursday, March 12, 2009

Square Footage Per Floor

10th Floor - 6,840 [Ski Run Stop]
9th Floor - 8,910 [Bar/Lounge]
8th Floor - 8,910 [Cafeteria]
7th Floor - 6,840 [Spa]
6th Floor - 6,840 [Spa]
5th Floor - 6,840 [Spa]
4th Floor - around 6,840 [Ski-Pass through]
3rd Floor - around 6,840 [Ski-Pass through]
2nd Floor - TBD { (Office) + (Kids) }
1st Floor - 8,200 { (Lobby) + 200 (Medical) + 400 (Retail) + 1,874 (Rentals) + 1,326 (core) }
Basement - >9,640 { 6840 (Ski Run Stop) + 2,800 (Changing rooms/Bathrooms/Locker) + ??? (Mechanical)